CSLB C-8 · San Mateo County

Concrete work in San Mateo County, CA, read off the public record.

0 concrete jobs hit the public record in San Mateo County in the last 30 days.

Foundations first: reading the sitework pipeline before the concrete bid goes out. Review the source stage and named contractor to see whether the project may need your part of the work.

Measured here

What Deal Radar has actually tracked in San Mateo County.

0 Concrete jobs, last 30 days Records at the stage this trade is bought, in San Mateo County.
137 Permits tracked in San Mateo County Applications and issuances stored and deduplicated.
5 Triggers for CSLB C-8 Distinct record types scored for this trade.

Coverage updated October 31, 2026. Counts describe evidence ingested for San Mateo County, not every record that exists there.

An application describes intended work; an issued permit records an approval. Neither proves the work is unbought. Use these records to investigate complementary work, understand which contractors are active, and confirm the real schedule before contacting anyone. Check current source coverage.

The mechanism

Which records fire, and when.

Public record When it fires Who you contact
ADU permits Accessory dwelling unit permits: a second unit going up on an existing lot. the moment it is issued The general contractor The GC attached to a commercial filing, for when you are pitching to sub.
Encroachment permits Work in the public right of way, issued by the agency that owns the street. the moment it is issued The company on the filing The licensee, applicant, or operator named on a public record.
Grading permits Earth being moved on a site, normally the first physical sign a project is real. about 4 weeks after it is issued The general contractor The GC attached to a commercial filing, for when you are pitching to sub.
Pool permits A permit pulled to build a swimming pool, naming the pool contractor and the address. about 3 weeks after it is issued The contractor on the permit The licensed contractor named on the record, resolved through the CSLB registry. Business to business, and their contact details are already public.
SWPPP notices of intent A stormwater filing required before ground disturbance over one acre. about 6 weeks after it is filed The general contractor The GC attached to a commercial filing, for when you are pitching to sub.

Full detail, including the limits of each record, on the Concrete page. Everything Deal Radar monitors in this market is on the San Mateo County radar.

Start here

Check coverage for concrete in San Mateo County.

See the San Mateo County records scored for CSLB C-8.

Pick your classification and your drive radius at sign-up and the San Mateo County feed is filtered to the records that predict your work. $99 a month, one market included, cancel from Settings. Nothing is ever sent in your name.

Start monitoring, $99/mo

Greater Sacramento is the market open for subscription today: Sacramento and Yolo county records, plus Stockton and Manteca permits in San Joaquin County.

Keep looking

Other trades in San Mateo County.

Concrete in other markets.